Photo feature: Bridge of Sighs shows progress

Published 12:02 am Wednesday, April 8, 2015

Dozer LLC project manager Don Nelson and project supervisor Neal Case look over blueprints of the bridge over Roth Hill Road. The next step in construction for Dozer is determining the safest and most practical way of combining the new bridge with the existing fence and walkway on the bluff. Above, Dozer talks to workers about what to do next in the construction process. (Sam Gause / The Natchez Democrat)

Dozer LLC project manager Don Nelson and project supervisor Neal Case look over blueprints of the bridge over Roth Hill Road. The next step in construction for Dozer is determining the safest and most practical way of combining the new bridge with the existing fence and walkway on the bluff. Above, Dozer talks to workers about what to do next in the construction process. (Sam Gause / The Natchez Democrat)

(Sam Gause / The Natchez Democrat)

(Sam Gause / The Natchez Democrat)

(Sam Gause / The Natchez Democrat)

(Sam Gause / The Natchez Democrat)